Here at JW McDonald Building Services Ltd we are well established in installing kitchens & bathrooms. We offer to all our clients a transparent service from start to finish and we like our client to feel they are in control of their kitchen & bathroom installation budgets.
As a company we offer two different services, one is a supply and fit service and other is a labour only service for those who like to choose their own materials.
The bath & shower room installation we have just completed is based in off Lee High road SE13, which is near Lewisham SE13 or near Blackheath SE12 / SE3.
This bathroom remodelling job has been split into 2 jobs because it has a separate toilet and bathroom. In some instances, we would knock the wall down to make it one large bathroom or shower room but, in this property, they wanted to keep it as separate rooms
The job was an interesting bathroom remodelling job because they no longer wanted a bathroom and was more interested in having a shower room for convenience.
Shower rooms or walk in showers are becoming more common for a quick fast pace life
The separate toilet means that if some body needs a shower toilet can still be used always
When installing a new shower room or remodelling an old bathroom we normally must update the electrics to bring everything in line with NIC regulation and safety. We always check that the electrical or wiring for a bathroom is a priority as electric and water don’t mix. We always issue a NIC certificate for all our work when complete a bathroom or shower room installation.
The bob we completed off Lee High Road SE13 we installed a new lighting ring for the bathroom and toilet. We also installed IP65 shower proof lights extractor fan and new switches
The boiler is an old gravity fed system, so we are installed new pump for the cylinder that gave them mains pressure hot water. We were able to give them mains cold water because the mains water feed was in the loft above the bathroom
The shower room-remodelling job consisted of the client buying their own materials and we will install them. We offer the client advice on what materials to buy and offer them our great company discounts on tile from Topps Tiles.
Here is an outline of the materials needed for this shower room below:
SHOWER ROOM MATERIALS
- Buy and install a new shower pump
- Install new pipe work
- Install new IP65 LED lights
- Install new toilet, small wash basin
- Complete tiled shower room
- Low profile shower tray
- Glass walk in style shower
- Extractor fan
- Towel rail
- Thermostatic shower
This should give you a good idea of what we can be achieved for our customer on a regular basis. If you need our help with any shower room or bathroom renovations, refurbishments, & remodelling then please contact us: Email jwmbuildingservices@icloud.com or use the contact form or call us on 0800 335 7772.
AREAS WE COVER:
Bromley BR1, Bromley BR2, Bromley BR3, West Wickham BR4, Farnborough BR6, Orpington BR5, Orpington BR6, Chislehurst BR7, Petts Wood BR5 Crystal Palace, Brockley, Hither Green SE13, London Streatham SW16; London Abbey Wood SE2; London Blackheath SE3; London Brockley SE4; London Catford SE6; London Deptford SE8; London Eltham SE9; Greenwich London SE10; London Lee SE12; London Lewisham SE13; London Norwood SE19; London Anerley SE20; London Dulwich SE21; London East Dulwich SE22; London Forest Hill SE23; London Herne Hill SE24; London South Norwood SE25; London Sydenham SE26; London West Norwood SE27; London Thamesmead SE28, South London
