18 Jan 2018

Here at JW McDonald building services we believe that bathroom renovations & remodelling is something which a lot of homeowners will encounter at some point and we see a lot of this happening in South London. We have seen a new culture of property spending trends when it comes to bathrooms, the bathroom has to be robust and trendy which means there is a constant change in the materials used to make a bathroom meet our current needs.

WHY DO I BRING THIS UP ABOUT CURRENT TRENDS?

Throughout South London, we see these trends changing which is now changing our view on how much the new bathroom remodel will cost. There are a few different attitudes, which have shaped our trends, which are, thermostatic showers or power showers, spotlights, under floor heating, Heated towel rails, expensive natural stone tiles & flooring. We have built in or inter grated bathroom fittings like toilets, sinks double sinks with storage, we can even have chrome pipe work under the sink because we want everything to be pleasing to the eye.

BATHROOM REMODEL COST

This will now depend on what type of bathroom idea you are looking for to fit in with the current trends for this time. We also see that your bathroom will be an investment and this is another reason for your bathroom renovation or installations cost to be determined by these factors. When we put all this together we can see why some bathroom costs are very expensive and the materials are very unforgiving to work with. The installer or plumber will have their work cut out making sure that all the expensive and beautiful things you have bought will be transformed into this wonderful bathroom you have in your mind.

COST OF THE AVERAGE BATHROOM INSTALLATION

We cannot put a cost on an average bathroom renovation or installation because there are too many varying factors like building & electrical work. But if you consider there will be just one main installer or plumber who will be carrying out the installation and fitting of the main items it’s better to try and secure an average day rate, which can be transformed into an average amount of days to complete the job. The average day rate should ruffle be £300.00 per day and I would say it takes approximately three weeks to complete a bathroom from start to finish. This would mean an average bathroom installation or renovations labour cost could be, £3,500.00 £5,000.00 This will sometimes exclude materials like timber, screw, pipe work & fittings, which I would add on another £250.00 – £300.00. There are other building works costs as well as the bathroom suite it self to be bought and we would recommend that the installer should help to choose what is suitable for your new bathroom project.

 

Please contact us for more information: info@jwmcdonaldbuildingservice.com Or call us free: 0800 335 7772 Mobile: 07713741026

AREAS WE COVER ARE:

London Streatham SW16; London SW2 ;  South East London;   London Southwark & Bermondsey SE1;  London Abbey Wood SE2;  London Blackheath SE3;  London Brockley SE4;  London Camberwell SE5;  London Catford SE6; London Charlton SE7;   London Deptford SE8;  London Eltham SE9;  Greenwich London SE10;   London Lee SE12;  London Lewisham SE13;  London New Cross SE14;  London Peckham SE15;   London Woolwich SE18;  London Norwood SE19;   London Anerley SE20;  London Dulwich SE21;  London East Dulwich SE22;  London Forest Hill SE23;  London Herne Hill SE24;  London South Norwood SE25;  London Sydenham SE26;  London West Norwood SE27;  London Thamesmead SE28;  Bromley BR1, Bromley BR2, Bromley BR3, BR4 West Wickham, Farnborough BR6, Orpington BR5,  Orpington BR6, Chislehurst BR7, Petts Wood BR5